Service: DfMA & Precast Concrete
Sectors: Residential, Mixed Use, Leisure
Client: PCE
Size: 140 bed aparthotel
A 14 storey hybrid precast concrete aparthotel which adopted precast sandwich panels, delta beam floor beams, pre-stressed solid slabs, and solid precast core walls & column.
The load bearing brick faced sandwich panels allowed the entire frame to be constructed and made weather tight in 16 weeks from commencement using only 9 men below the hook.